[

Wall Coating Application Table

Note: This page is best on viewed on smartphones in landscape/horizontal orientation.

Neoflex

Neocrylic

Neocrylic HB

Neocrylic LR

Wall-Gard HD

 

Neoflex

Coat Product Coverage
Rate
Mils
DFT
Recoat Time,
75°F/23°C
Substrates
and Primers:
Chalky/Porous Concrete/Masonry: 7031-100
Chalky Painted: 7031-100
EIFS: 7031-100
New Concrete/Masonry, Wood: 3090 Multi-Grip II
Ferrous Metal: 33304/99953 Chem-O-Pon or 3090 Multi-Grip II
Galvanized Metal: 3090 Multi-Grip II
150-300 sf/gal
175-400 sf/gal
150-300 sf/gal
100-400 sf/gal
200-300 sf/gal
400-500 sf/gal
Variable 8-32 hours
5-Year System 7100 series 80 sf/gal 8-10 8-32 hours
10-Year System First Coat: 7100 series
Second Coat: 7100 series
80 sf/gal
80 sf/gal
8-10
8-10
8-32 hours
Optional Topcoat 7170 series 75-100 sf/gal 8-10 NA

Return to Table of Contents
 

Neocrylic

Coat Product Coverage
Rate
Mils
DFT
Recoat Time,
75°F/23°C
Substrates
and Primers:
Chalky/Porous Concrete/Masonry: 7031-100
Chalky Painted: 7031-100
EIFS: 7031-100
New Concrete/Masonry, Wood: 3090 Multi-Grip II
Ferrous Metal: 33304/99953 Chem-O-Pon or 3090 Multi-Grip II
Galvanized Metal: 3090 Multi-Grip II
150-300 sf/gal
175-400 sf/gal
150-300 sf/gal
100-400 sf/gal
200-300 sf/gal
400-500 sf/gal
Variable 8-32 hours
Coating: 7151 series 200-300 sf/gal Min. 3 NA

Return to Table of Contents

 

Neocrylic HB

Coat Product Coverage
Rate
Mils
DFT
Recoat Time,
75°F/23°C
Substrates
and Primers:
Chalky/Porous Concrete/Masonry: 7031-100
Chalky Painted: 7031-100
EIFS: 7031-100
New Concrete/Masonry, Wood: 3090 Multi-Grip II
Ferrous Metal: 33304/99953 Chem-O-Pon or 3090 Multi-Grip II
Galvanized Metal: 3090 Multi-Grip II
150-300 sf/gal
175-400 sf/gal
150-300 sf/gal
100-400 sf/gal
200-300 sf/gal
400-500 sf/gal
Variable 8-32 hours
5-Year System 7170 or 7172 80-100 sf/gal 8-10 8-32 hours
10-Year System First Coat: 7170 or 7172
Second Coat: 7170 or 7172
80-100 sf/gal
80-100 sf/gal
8-10
8-10
NA

Return to Table of Contents
 

Neocrylic LR

Coat Product Coverage
Rate
Mils
DFT
Recoat Time,
75°F/23°C
1-Coat System 7051 200 sf/gal 3 NA
2-Coat System First Coat: 7051
Second Coat: 7051
200 sf/gal
200 sf/gal
3
3
8-32 hours
NA

Return to Table of Contents
 

Wall-Gard HD

Concrete or Block Wall: Series 1, Standard
Coat Product Color Mix
Ratio
Coverage
Rate
Mils
WFT/DFT
Recoat Time,
70°F/21°C
Primer 70714/70715 Clear 2:1 320 sf/gal 6/6 8-12 hours
Base 70724/70725 Gray 3:1 100 sf/gal 16/16 8-12 hours
1st Topcoat 70900/70910 or
70901/70910 or
70902/70910
Pigmented 3:1
3:1
2:1
200-267 sf/gal 8-6/6-3 4-6 hours
2nd Topcoat 70900/70910 or
70901/70910 or
70902/70910
Pigmented 3:1
3:1
2:1
200-267 sf/gal 8-6/6-3 4-6 hours
 
Concrete or Block Wall: Series 2, Fabric Reinforced
Coat Product Color Mix
Ratio
Coverage
Rate
Mils
WFT/DFT
Recoat Time,
70°F/21°C
Primer 70714/70715 Clear 2:1 320 sf/gal 6/6 8-12 hours
1st Base 70724/70725 Gray 3:1 100 sf/gal 16/16 8-12 hours
Fabric 63UJB fiberglass mesh, embedded into 1st Base Coat
2nd Base 70724/70725 Gray 3:1 100 sf/gal 16/16 8-12 hours
1st Topcoat 70900/70910 or
70901/70910 or
70902/70910
Pigmented 3:1
3:1
2:1
200-267 sf/gal 8-6/6-3 4-6 hours
2nd Topcoat 70900/70910 or
70901/70910 or
70902/70910
Pigmented 3:1
3:1
2:1
200-267 sf/gal 8-6/6-3 4-6 hours
 
Drywall: Series 1, Standard
Coat Product Color Mix
Ratio
Coverage
Rate
Mils
WFT/DFT
Recoat Time,
70°F/21°C
Primer Polyvinyl Acetate (PVA). Follow manufacturer's recommendations.
1st Topcoat 70900/70910 or
70901/70910 or
70902/70910
Pigmented 3:1
3:1
2:1
200-267 sf/gal 8-6/6-3 4-6 hours
2nd Topcoat 70900/70910 or
70901/70910 or
70902/70910
Pigmented 3:1
3:1
2:1
200-267 sf/gal 8-6/6-3 4-6 hours
 
Drywall: Series 2, Fabric Reinforced
Coat Product Color Mix
Ratio
Coverage
Rate
Mils
WFT/DFT
Recoat Time,
70°F/21°C
Primer Polyvinyl Acetate (PVA). Follow manufacturer's recommendations.
1st Base 70724/70725 Gray 3:1 100 sf/gal 16/16 8-12 hours
Fabric 63UJB fiberglass mesh, embedded into 1st Base Coat
2nd Base 70724/70725 Gray 3:1 100 sf/gal 16/16 8-12 hours
1st Topcoat 70900/70910 or
70901/70910 or
70902/70910
Pigmented 3:1
3:1
2:1
200-267 sf/gal 8-6/6-3 4-6 hours
2nd Topcoat 70900/70910 or
70901/70910 or
70902/70910
Pigmented 3:1
3:1
2:1
200-267 sf/gal 8-6/6-3 4-6 hours
Note: Base coats + fabric are only required if walls will be subect to impact or abuse.
 

Return to Table of Contents