Name of Project:
Deer Park ISD
Clyde Abshier
Stadium
Renovation
Applicator:
Texas Moisture
Protection
Company (TXMP)
Regional
Manager:
Theron Rogers
Design By:
cre8 Architects
General
Contractor:
Brae Burn
Construction
Systems
Installed:
Peda-Gard
Traffic Coating
- 75,000 SF |
The stadium
originally
opened in 1965
and was in need
of some aesthetic
as well as
structural
repairs.
The structure is
comprised of
precast concrete
stands with
aluminum
seating.
The precast
stands still had
the original
NEOGARD
Peda-Gard
traffic coating,
which is a
testament to the
durability of
the product.
Throughout the
duration of the
project TXMP has
repaired several
hundred cubic
feet of concrete
and installed
approximately
1,500 gallons of
NEOGARD traffic
coating on the
75,000 square
foot structure.
TXMP performed
several adhesion
tests and
mock-ups on the
existing coating
to confirm the
system would
function
properly. To
help further
ensure the
quality of the
job, NEOGARD’s
technical
representative
also made
several visits
while the
coating was
applied.
Congratulations
to TXMP for a
job well done!
|