As Operations Manager, Mike Flanigan manages NEOGARD’s production of goods and services and has the responsibility of ensuring that business operations are efficient in terms of using the optimal amount of resources and is effective in meeting customer requirements. Some of his daily activities include international orders, inventory control, pricing, budgeting, and overseeing the NEOGARD Customer Service group. Mike has been a part of NEOGARD for over 36 years and has been involved in many segments of the business that has allowed him to support the construction products industry in many ways.


Contractor:  Butcher & Baecker Construction Co., Inc.
Chief Estimator/Foreman:  Robert Meller/Chris Bailey
Name of Project:  Mass Transportation Authority - Flint, MI
Existing Roof:  Fully adhered/Mechanically attached EPDM & PVC
System Installed:  Elasta-Gard SP
Area:  Administration Bldg. (14,200 SF), Operations Bldg. (259,200 SF) & Greyhound Station (9,500 SF)
Regional Manager:  Jim Rogers

Scope of Work Performed:  Before work began, all roof areas received an infrared roof scan to determine wet areas in the existing roof systems.  A map with the results of the infrared scan was then forwarded to the Owner and then confirmed with test cuts and marked on the roof for ease of recognition.  All wet areas were removed and replaced with new material to match existing roof height and membrane materials.

Each roof was power washed with 8500 Biodegradable Cleaner and allowed to dry.  All seams were examined and patched as required with 86218 Flashing Tape with the balance of the seams receiving a treatment of 7419-HB and Tietex fabric for reinforcement.  After preparation, the Elasta-Gard SP Roof System was installed.

Project Overview:  The facility manager, Lynn McLean had the foresight to notice that now was the time to try and prolong the life of the existing roofing systems instead of waiting a few more years and incurring an expensive cost of total tear-off and replacement.

The white energy star rated and sustainable Elasta-Gard SP system looks great and is the result of quality workmanship by Butcher & Baecker's crew.  Upon completion of the project, all the crew wanted to know is "when is the next one"?  Many thanks to those involved in making this project a reality.


Home (Technical)
Home (Marketing)
Corporate Contacts
Regional Managers
Credentials

Waterproofing
Foam Roofing
Direct Bond Roofing
Flooring
Wall Coatings

Technical Documents
Guide Specifications
Product Data
Detail Drawings
MSDS

Warranty Samples
LEED Information

Project Profiles
What's New
Blog Site

Copyright © 2010 NEOGARD Div. of JONES-BLAIR, Inc. All Rights Reserved.
Reproduction in whole or in part in any form or medium without express written permission of NEOGARD is prohibited.

Back to top